Boring Company Builds New Loop Station Near UNLV

A new station near the UNLV campus will soon offer commuters more direct access to the city's underground transit network.

Updated on Oct. 21, 2026 in Electric Vehicles

Isometric editorial illustration of a concrete tunnel entrance descending into desert terrain, representing an underground transit station expansion.
The Boring Company is constructing a new transit station near the UNLV campus, expanding the underground network across Las Vegas. AI Illustration. Upload story photo >

Live Poll

Do you believe expanding underground transit loops is an effective way to reduce local traffic?

The Boring Company is currently building a new tunnel station on the UNLV campus across from the Thomas & Mack Center. This expansion marks the latest phase in the underground transportation network, which currently features over a dozen operational stations across Las Vegas.

Why it matters

Expanding the tunnel network helps connect more parts of the city through an underground system that offers efficient travel times and predictable costs for residents and commuters. The company aims to add 14 more stations to the existing layout to improve local transit access.

The current tunnel system supports transit such as a four-minute ride between the Convention Center and Resorts World for under $5. There are currently 14 future stations planned for development following the completion of the UNLV site.

The players

The Boring Company

An infrastructure and tunnel construction services company that develops underground transit systems in urban areas.

The details

The Boring Company constructs these stations to integrate into an underground network that bypasses surface traffic. The new UNLV stop is being designed to provide direct routes to existing locations including the Westgate and the Virgin Hotel. These infrastructure additions rely on specialized tunnel-boring equipment to link high-traffic areas across the city.

Timeline

  1. September 2026: Goal to complete current station construction.

  2. November 2026: Target window for operational readiness before the Formula 1 race.

The Home Front

This project follows the established development pattern for the Las Vegas Loop, which aims to link major event centers to the broader municipal transit grid. The growth of this underground network represents a significant shift in urban infrastructure planning for major entertainment hubs.

Residents and commuters should note that transit options near the UNLV campus will increase once the station becomes operational. Keep an eye on local transit announcements to see how these new connections might alter your regular travel routes through the city.

The takeaway

The addition of an UNLV station marks a continued effort to make underground travel a more accessible transit option for commuters across the valley. Residents looking for alternative ways to navigate the city should watch for updates on when these new routes open for public use.

What happens next

The company has set a goal to have the UNLV station completed by September 2026, with an aim to be fully operational in time for the Formula 1 race in November 2026.

Further reading

Learn more about local transit developments in the Electric Vehicles section.

Live Poll

Do you believe expanding underground transit loops is an effective way to reduce local traffic?